The affected structural members are inspected to understand their existing condition, visible damage, access conditions and intended strengthening requirement. Available structural drawings, assessment reports and strengthening designs are reviewed before work begins.
The structural members requiring treatment are identified and their condition is documented. Cracks, spalling, exposed reinforcement, corrosion, delamination, honeycombing and other visible defects are mapped before repair.
Where required by the approved strengthening methodology, temporary supports, propping or load restrictions are established before damaged concrete is removed or strengthening work begins.
Unsound, loose and deteriorated concrete is carefully removed until sound substrate is reached. The exposed concrete and reinforcement are cleaned and prepared for the specified repair or strengthening system.
Exposed reinforcement is inspected for corrosion and section loss. Corroded steel is cleaned and treated using the specified corrosion-protection system. Additional reinforcement is installed where required by the approved strengthening design.
Cracks and localised defects are repaired using suitable compatible materials. Depending on the crack condition and approved methodology, treatment may include resin injection, flexible injection, repair mortar or other specified systems.
The existing concrete surface is prepared to achieve the required bond with the new repair or strengthening material. Bonding agents, mechanical preparation or other interface treatments are applied where specified.
The selected strengthening system is installed according to the approved structural design. Depending on the project, this may include micro-concrete or RCC jacketing, steel strengthening, FRP / CFRP reinforcement, section enlargement or other approved strengthening methods.
For carbon fibre wrapping, corners are rounded, the substrate is ground and primed, and CFRP sheets or laminates are bonded with structural epoxy in the designed number of layers and orientation — then finished with a UV, fire or plaster protective coat where specified.
Where specified, micro concrete or suitable structural repair material is placed into the prepared strengthening zone. Formwork and confinement are maintained as required to achieve complete filling and proper consolidation.
Repair and strengthening materials are allowed to cure under the conditions required by the selected system. The treated structural members are protected from impact, loading and disturbance during the specified curing period.
Where required, the completed repair or strengthening work is inspected and tested. Testing may include concrete strength, bond strength, crack monitoring, load testing or other verification specified for the project.
The completed structural repair or strengthening work is inspected against the approved scope and methodology. Photographs and applicable test or completion records are compiled for handover.