Quality control · IND-QA-FRM-001

Request for
Inspection

Raise an RFI, send the client link to the inspector, then record rectification and closure — all on one record.

INDIGOiND Construction Solutions (P) Ltd.

REQUEST FOR INSPECTION (RFI)

Quality Control & Site Inspection Record

PART A — REQUEST BY CONTRACTOR

Inspection Stage *

Minimum notice for inspection: 24 hours.
Signature *

PART B — INSPECTOR'S OBSERVATIONS

ChecklistYesNoN/A
Measured Results
ParameterSpecifiedMeasuredPass / Fail
Observations / Deficiencies
Photographs

PART C — INSPECTION RESULT

Result *
Comments / Corrective Actions Required
Inspector's Signature *

PART D — RECTIFICATION / CLOSURE

Rectification — by contractor

Corrective Action Taken *
Photographs after rectification
Contractor's Representative Signature *

Reinspection & closure — by inspector

Final Status *
Inspector's Remarks
Inspector's Signature *
Control Note: One RFI per work item and location. Contractor completes Part A and the rectification fields of Part D; the inspector completes Parts B, C and closure. Work at a designated hold point shall not proceed until the required approval / release is obtained.
Document No.: IND-QA-FRM-001 | Revision: 01 | Retain as a project quality record.